Status update July 8

Another couple of productive weeks. Last week was spent mostly by Frank, Erwin, Remmelt and Roel to build the construction behind the wall, after which we started building the middle part of the wall (the dino). Last Friday we completed the Arc, connecting the back wall with the dino.

The Arc connecting the back wall to the dino

The Arc connecting the back wall to the dino

Furthermore a large part of the carcass for the dressing rooms is built by Dick, Ronald, Quirijn, Joran, Jelle and Hans and it gives a totally different view. Last Friday Hans and Yvette, with a helping hand from Rolf, finished the baseboards around the concrete, so the sand used to level the floor under the concrete is now locked in.

Structure of the dressing rooms with the boards locking in the sand in front

Carcass of the dressing rooms with the baseboards in front

Dick, Ineke, Ronald, Nick, Rolf, Joran, Jelle, Steven, Rens, Hans, Peter, Quirijn, Hans en Yvette: Thanks a lot for all your help!